Why Yerington, Nevada?

The Yerington Copper Project is strategically located in one of the most prolific copper districts in the U.S., offering a rare combination of high-confidence mineral reserves, existing infrastructure, and a mining-friendly regulatory environment. With strong demand for domestic refined copper, Yerington is uniquely positioned to deliver—quickly, efficiently, and responsibly.

A Copper-Rich District with Room to Grow

Yerington sits at the heart of a multi-billion-pound copper district, with significant deposits concentrated within a 10-mile radius. This presents a unique district consolidation opportunity, allowing for shared infrastructure, streamlined permitting, and scalable production.

Lion Copper is strategically positioned in this area, holding significant land assets in a prolific and central location in the region.

  • District inventory is estimated at 19.2+ billion pounds of copper in the Measured and Indicated (M&I) categories. In addition to Lion Copper’s Yerington and MacArthur Mines, this includes additional assets at Ann Mason, and Pumpkin Hollow.
  • Lion has a strategic position and is the logical center for shared mineral processing and mine infrastructure in the area.
  • Lion Copper Corp. brings local mining experience and community support, with established relationships with local, Tribal, state and federal governments.

The Project                            The Opportunity


Nevada: A Proven Mining Jurisdiction with a Clear Regulatory Pathway

Nevada ranks as the second most attractive investment destination for mining projects in the world.* In addition to extensive mineral resources, Nevada provides a stable and mining-friendly regulatory environment, with clear permitting processes, competitive tax structures, and a well-established legal framework that ensures efficient project advancement. Nevada offers:

  • Predictable and efficient permitting, reducing uncertainty and accelerating development timelines.
  • Supportive policy with favorable state and local government engagement.
  • Pro-business tax framework that enhances project economics.
  • Commitment to sustainable resource development, reducing long-term project risks with science-based mining practices.

*Fraser Institute Annual Survey of Mining Companies, 2023

Brownfield Advantage: Better & Faster Development

Unlike undeveloped greenfield sites, Yerington benefits from a brownfield advantage—utilizing a site with previous mining activity and existing infrastructure. This means:

  • Streamlined permitting with fewer regulatory hurdles.
  • Faster development timelines and accelerated production.
  • Reduced environmental impact and limited new disturbance.
  • Greater community acceptance compared to greenfield projects.

Favorable Project Economics & Efficient Mining

Yerington’s exceptional resource efficiency and onsite processing capabilities drive low costs and strong project economics.

  • Competitive cost profile with a very low waste-to-ore strip ratio, efficient heap leach processing, and streamlined logistics.
  • Exceptionally low strip ratio, with just 0.3 tons of waste per ton of ore mined.
  • Onsite copper cathode production, producing 99.99% pure LME Grade A copper cathode onsite.

Infrastructure & Water Access for Cost-Effective Operations

The project is supported by established utilities and transportation networks, including:

  • Secured water rights for uninterrupted operations.
  • Reliable power supply from existing infrastructure.                 
  • Direct access to rail and highways for efficient logistics.

Let’s talk. Contact us to learn more about our project.

Lion Copper Corp.
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.